Domain B · Concepts and Principles

Tandem schedule of reinforcement

Definition

A compound schedule in which two or more basic schedules occur in a fixed order without distinct signals for each component, and only completing the final component produces reinforcement.

In plain words

A tandem schedule works like a chained schedule, but nothing changes to tell the learner that one component has ended and the next has begun. Reinforcement comes only after the whole sequence is done. Abbreviated “tand” (for example, tand FR 10 FI 30 s).

Examples

Under one unchanging light, 10 pecks complete the first component, and then the first peck after 30 seconds produces food.

A child must complete 5 puzzles, and then the first request after 2 minutes earns a break, with no signal that the puzzles part is finished.

Non-example

The light changes color when the first component is complete. That signal makes it a chained schedule.

Commonly confused with

Exam tip

Think “tandem bicycle”: riders in sequence, one frame, no separate signals. If each component has its own signal, the answer is chained.

Scroll to Top